LNG Loading Facilities

Marine Geotechnical & Geophysical Investigations

Geotechnical information was required for the engineering design for proposed Liquefied Natural Gas (LNG) loading facilities.

PROJECT SUMMARY
Project start: Apr 1999
Project completion: Sep 2000
Sectors: Infrastructure, Oil & Gas
Project location:Edku, Alexandria, Egypt

CARES personnel provided project management and site supervision services. The planned facilities included a trestle jetty and LNG loading dock; marine access channel; turning basin; construction dock; and, breakwater. 

To provide the required information a geotechnical investigation was conducted which covered the complete geotechnical scope including field data gathering (soil borings for sample collection / Cone Penetration Tests (CPT)); laboratory testing; data evaluation and preparation of the data reports. 

The geophysical site investigation included data acquisition utilising an Echosounder. Side Scan Sonar, Sub-Bottom Pinger Profiler, Magnetometer and for the nearshore Seismic Refraction. 

SERVICES PROVIDED:
  • Project Management;.
  • Supervision.
  • Contract Administration of:
  • Geotechnical Investigation & Geophysical Investigation

    Similar Projects

    Liquefied Natural Gas Facility

    British Gas International wan ...

    Read More

    Gas to Liquids Plant

    The Escravos Gas to Liquids ( ...

    Read More

    LNG Loading Facilities

    CARES personnel provided proj ...

    Read More

    CARES
    Accreditations & Memberships

    © 2019 CARES Group. All rights reserved.