Wissington Bioenergy Project

Advice On Geotechnical Design Of Two Lagoons, Including Liner

British Sugar Plc. is building a biogas facility to produce 100,000m³ of gas per day. This will provide energy for the factory, which is the largest sugar beet factory in Europe. Services provided included: • Advice on the location, conceptual and detailed design for 2 lagoons for the project requiring 150,000m3 for biogas and 50,000m3 […]

PROJECT SUMMARY
Project start: Dec 2009
Project completion: Jan 2013
Sectors: Infrastructure
Project location:Wissington, Norfolk, UK

British Sugar Plc. is building a biogas facility to produce 100,000m³ of gas per day. This will provide energy for the factory, which is the largest sugar beet factory in Europe.

Services provided included:

• Advice on the location, conceptual and detailed design for 2 lagoons for the project requiring 150,000m3 for biogas and 50,000m3 for water storage.

• Designed and supervised the installation of ground water monitoring equipment

• Conducted regular groundwater monitoring

SERVICES PROVIDED:

Similar Projects

Dredging Optimisation Study

Following observations that t ...

Read More

Container Terminal Development

APM Terminals (APMT) have bee ...

Read More

Wissington Bioenergy Project

British Sugar Plc. is buildin ...

Read More

CARES
Accreditations & Memberships

© 2019 CARES Group. All rights reserved.