Apapa Terminal: Structural Stability study

NIPCO PLC wished to deepen one of the oil jetties at Apapa Petroleum Terminal in order for fully loaded 30,000 DWT tankers to be able to use the jetty.

PROJECT SUMMARY
Project start: Jun 2013
Project completion: Jun 2013
Sectors: Infrastructure, Maritime, Oil & Gas
Project location: Lagos, Nigeria

NIPCO PLC wished to deepen one of the oil jetties at Apapa Petroleum Terminal in order for fully loaded 30,000 DWT tankers to be able to use the jetty.

SERVICES PROVIDED:
  • Geotechnical site investigation and hydrographic survey
  • Condition survey of existing jetties and structural assessment
  • Options for deepening the jetties, including rebuilding or extension to the existing structures
  • Stability of slopes after dredging, and stability of nearby quay wall
  • Similar Projects

    Okan Field Survey

    TCO Marine / Chevron Nigeria ...

    More

    Liquefied Natural Gas Facility

    British Gas International wa ...

    More

    Gas to Liquids Plant

    The Escravos Gas to Liquids ( ...

    More

    CARES
    Accreditations & Memberships

    © 2020 CARES Group. All rights reserved.

    Follow us on