Dredging Optimisation Study

CARES evaluated different options available for dredging
optimisation with respect to dredging methodologies

Following observations that the Notore Channel suffers from high siltation CARES were commissioned to undertake a siltation study in order to understand how the sediment regime works in the creek.

PROJECT SUMMARY
Project start: Aug 2013
Project completion: Aug 2019
Sectors: Maritime, Infrastructure
Project location: Nigeria

Following observations that the Notore Channel suffers from high siltation CARES were commissioned to undertake a siltation study in order to understand how the sediment regime works in the creek.

After understanding the underlying processes that lead to high siltation, CARES evaluated different options available for dredging optimisation with respect to dredging methodologies, channel design and engineering intervention.

SERVICES PROVIDED:
  • Deployment of equipment to measure; Turbidity, Salinity, Currents and Meteorology
  • Data collection & analysis
  • Hydrodynamic modelling
  • Similar Projects

    Dredging Optimisation Study

    Following observations that ...

    More

    Container Terminal Development

    APM Terminals (APMT) have bee ...

    More

    Apapa Terminal: Structural Stability...

    NIPCO PLC wished to deepen ...

    More

    CARES
    Accreditations & Memberships

    © 2020 CARES Group. All rights reserved.

    Follow us on