Environmental, Social & Health Impact Assessment

To enable Floating Production Storage and Offloading (FPSO) topside fabrication and integration a 120,000m3 fabrication yard and quay wall are being constructed at the LADOL Free Zone. To support this development CARES have been assigned to carry out an Environmental & Social Impact Assessment (ESIA) on behalf of SHI-MCI Free Zone Enterprise. The ESIA is […]

PROJECT SUMMARY
Project start: Jun 2015
Project completion: Jun 2016
Sectors: Infrastructure
Project location: LADOL Free Zone, Lagos, Nigeria

To enable Floating Production Storage and Offloading (FPSO) topside fabrication and integration a 120,000m3 fabrication yard and quay wall are being constructed at the LADOL Free Zone.
To support this development CARES have been assigned to carry out an Environmental & Social Impact Assessment (ESIA) on behalf of SHI-MCI Free Zone Enterprise.
The ESIA is being conducted to assess the potential impacts of the project and has been carried out in line with the Environmental Impact Assessment Act 86 1992.
During the ESIA CARES have determined the Environmental and Social Baseline through specialist fieldwork and data analysis. Against this baseline the likely effects of the project have been identified, predicted and evaluated.
The ESIA has also presented measures to prevent, mitigate and/or offset the significant adverse effects within an Environmental Management Plan (EMP).
The EMP provides a structured programme for the management of the works to ensure that all reasonable and practical measures will be implemented to prevent and/or minimise the likelihood of environmental harm being caused by the project.

SERVICES PROVIDED:
  • Environmental, Social and Health Impact Assessment (ESHIA).
  • Baseline data gathering.
  • Data analysis.
  • Stakeholder consultation.
  • Environmental and Social Management Plan (ESMP).
  • Similar Projects

    Dredging Optimisation Study

    Following observations that ...

    More

    Container Terminal Development

    APM Terminals (APMT) have bee ...

    More

    Apapa Terminal: Structural Stability...

    NIPCO PLC wished to deepen ...

    More

    CARES
    Accreditations & Memberships

    © 2020 CARES Group. All rights reserved.