The Nigerian Ports Authority identified a requirement for complete replacement and upgrading of the Aids to Navigation in the Bonny River. The complete replacement and upgrading of the Aids to Navigation in the Bonny River were required to provide safe passage of vessels of the deeper draft that were operating at the new quays within […]

PROJECT SUMMARY
Project start: Apr 1997
Project completion: Feb 1998
Sectors: Maritime
Project location: Borny River, Nigeria

The Nigerian Ports Authority identified a requirement for complete replacement and upgrading of the Aids to Navigation in the Bonny River.
The complete replacement and upgrading of the Aids to Navigation in the Bonny River were required to provide safe passage of vessels of the deeper draft that were operating at the new quays within the navigational channel at the port.
The project involved the system design and specification in consultation with the main channel users and in line with IALA recommendations.
The project also involved layout simulations and optimisation; tender preparation and procurement of the Aids to Navigation; contract award and supervision with positioning control for installation works; and pilot training and commissioning.

SERVICES PROVIDED:
  • System design and specification
  • Simulations and optimisation
  • Tender preparation and procurement
  • Contract award
  • Supervision of installation
  • Pilot training
  • Commissioning
  • Similar Projects

    Tidal Streams

    Lagos Harbour is key to the e ...

    More

    Bonny Channel Expansion

    The Bonny Channel is the main ...

    More

    Dredging Optimisation Study

    Following observations that ...

    More

    CARES
    Accreditations & Memberships

    © 2020 CARES Group. All rights reserved.

    Follow us on